Projects · Offices and administration
SIHD headquarters (G+8) and Ministry of Energy headquarters (G+5)
A G+8 office building of about 9,000 m² and a G+5 annex: full architectural design, reinforced-concrete structure, power and low-current systems, plumbing, façades and interior fit-out. Led by EAS and Challenge Etudes from design to handover, over 28 months of construction.
- Location
- Lotissement de la Gare / Héron, Djibouti City
- Client
- SIHD / Ministry of Energy and Natural Resources
- Funding
- SIHD
- EAS role
- Lead architect
- Team
- Elmi Architecture Studio, Challenge Etudes
- Construction value
- 19,000,000 USD
- Status
- Completed – 2024
- Services
- Architectural and construction design, structure and networks, full works supervision